On Vodafone Stoke a good deal of experimentation and design analysis was done all using sketch-up – often with no equivalent cad drawings which saved a lot of time and allowed thorough investigation into everything – The contractor Morgan Ashurst and site team of Andy Howarth , John Mills , Jon Lightfoot and the site team used these sketches to give a full brief to subcontractors and ending up doing a great job.
Leave a Reply