Another refreshing EGG project 2005

22 09 2009

After the initial project in 2003 to deliver a brand new innovative workspace in a pre-built shed – the next task came later in the form of a refresh of the other big shed EGG have in Derby – it was needed to satisfy staff in the ‘old’ shed that they too could have something a bit special – so we redesigned the reception areas , provided new cafes and meeting areas , refitted the toilets and updated most of the breakout areas which include a library , games room and relaxation area – I particularly like the privacy graphic on the meeting rooms that changes from circles to holes imperceptibly and the main feature stair with red perspex walls – There was an LED light wall specified that reacted to sound in the reception but this was soon switched off after complaints that fits would result !! -worked on this with Steve Brown and Li Qichang did some great 3D work.

The same base consultant team as all previous EGG projects were involved-

Notably the amiable Pete Andrews and Donna Harrison – all ex EGG now.

Project Manager was Simon Whelan of SWPM and cost control by Brendan Patchell of Bucknalls – now RLB who taught me a lot about 4 Dimensional cost planning !!!

Some nice graphics and pics……all built …all there now.EGGbeforeafter1total canoe smallPIC_0106aDSC00278x2153-SK005 (Light Wall)


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s




%d bloggers like this: